In a transformation, what changes first is how a building is read. The building itself changes later.
A commercial building initially stays the same: the same storeys, the same structure, the same façades, the same dimensions. Once it is earmarked for housing, however, what was taken for granted is reconsidered. A deep floor plate can work well for workspace yet raise questions of daylight and layout when converted to housing. An existing grid can enable new rooms or constrain their arrangement. Circulation, openings and transitions remain materially unchanged, yet they are read differently.
What changes is the meaning of what is already there.
This becomes evident in a study for the transformation of a commercial building in Bern. Before a new image is laid over the existing building, it must become clear which of its qualities can support a different use and where its existing order reaches its limits. The structure is designed for commercial loads, and the storeys are taller than residential use requires. Under this new reading, what may appear oversized becomes room for manoeuvre.
This shifts how perceived shortcomings are understood. A constraint can become a quality of the design. Conversely, keeping something needs a reason beyond the fact that it is already there. What matters is the spatial value an existing structure still holds under the new conditions.
The same study shows how demanding that judgement can be. It examined whether the height of the existing storeys could accommodate an additional level: two slabs would be replaced by three new ones. Here the study reaches an uncomfortable threshold. The deeper the intervention goes into the structure, the more pressing the question of at what point the idea of building on the existing fabric becomes little more than a claim. At the same time, an additional level would create more housing within the existing volume in a dense urban neighbourhood – without taking up further land.
Between old and new lies a step of its own: reassessment.
It reveals what can be carried forward, what has to be adapted, and what prevents a new use. From this, it becomes clear where intervention is necessary and where continuing to work with what exists may be the stronger solution.
All of this happens long before anything is removed, added, or opened up on site.
At that moment, a building can already become something else, even though no element has been altered. Its structure is the same. Its possibilities are not.